This presentation covers:

* Components of a successful maintenance program
* Maintenance of fixtures
* Cost breakout of maintenance
* Maintenance of UVGI fixtures
* Experience-based recommendations
* Fixture repair
* Lamp and fixture lifetime – supplier and manufacturer component lifetime estimates
* Fixture cleaning approaches

This document supported the 2008 "Engineering Methods for the Control of Airborne Infections: An International Perspective" course that took place at the Center of Continuing Professional Education at Harvard School of Public Health July 14-25, 2008.

Attached resource:
  • UVGI Equipment: Maintenance & Repair (download, 140.2 KB)

    Summary: This presentation covers:

    * Components of a successful maintenance program
    * Maintenance of fixtures
    * Cost breakout of maintenance
    * Maintenance of UVGI fixtures
    * Experience-based recommendations
    * Fixture repair
    * Lamp and fixture lifetime – supplier and manufacturer component lifetime estimates
    * Fixture cleaning approaches

    This document supported the 2008 "Engineering Methods for the Control of Airborne Infections: An International Perspective" course that took place at the Center of Continuing Professional Education at Harvard School of Public Health July 14-25, 2008.

    Source: Iridium 7 Group

    Publication Date: July 14, 2008

    Keywords: 2008 Harvard Engineering Methods Course, Engineering Controls, Harvard Airborne IC Course, Radiometry, Recommended Manufacturers & Suppliers, Training

 

This Community is Archived.

This community is no longer active as of December 2018. Thanks to those who posted here and made this information available to others visiting the site.